Under construction

Work is underway. Your job is documentation and pace: confirm each stage before you pay for it, and keep a written record of every change.

§ IWhat Usually Happens Next

Last reviewed September 2026 · Sources

0 of 4 done

Tick steps off as you go — your progress is kept on this device, nothing is sent anywhere. A finished checklist is a well-prepared file, not a verified transaction.

§ IIWhat To Watch For
  • Payments running ahead of work completed.

  • Verbal changes on site that nobody wrote down.

  • Materials substituted without approval.

§ IIIPapers And People
Who Is Involved
  • Builder
  • DRO
  • Architect
  • Municipal inspectors
Documents That Show Up
  • Stage inspection records
  • Change orders
  • Invoices (facturas)
  • Progress photos
Sources And Last Reviewed

This guide was last reviewed in September 2026. Laws, rates, and municipal requirements change. Treat this page as a starting point and confirm anything you intend to rely on with your notario or an independent Mexican attorney.

  • Article 27, Constitución Política de los Estados Unidos Mexicanos

    Foreign nationals cannot hold direct title inside the restricted zone; the bank trust exists because of this article.

  • Municipal planning and land-use offices, Baja California Sur

    Land use (uso de suelo), construction licensing, and permit requirements differ by municipality.

  • Ley del Notariado para el Estado de Baja California Sur

    Defines what a notario must verify, certify, calculate, and file for a property transfer.

§ IVGet Guidance

Talk it through before the next step.

A session works through your actual situation: what matters at this stage, what is still unknown, and what should happen next.

Building Clarity Session · $295 · 60 minutes

If you move into a larger paid Baja Property Insider advisory engagement within 14 days, this session fee can be credited toward that engagement.

24/7 Receptionist